Skip to main content
BuilderGrid

Budget & transactions

Budgets the spreadsheet cannot corrupt.

Build the budget once, lock it down, and watch transactions reconcile against it as the project runs. Less forensic month-end work to figure out where the framing money went.

What it covers

Schema-enforced line items

The trade, division, cost code, and vendor fields are all validated against project-level lists. Vendor names like "ESJ Plumbing" and "ESJ Plumb" cannot end up on different rows of the same project.

Transactions reconcile against budget

Each transaction posts against a specific budget line, and variance is visible in real time rather than at month-end.

Change orders without tears

A change order updates the relevant budget lines and snapshots the prior version, leaving a full audit trail on the project.

Built-in calculators

Markup, contingency, soft costs, and retainage held are all derived from the budget rather than maintained on a parallel sheet.

How it fits the workflow

  1. Step 1

    Import or build the budget from a template

  2. Step 2

    Lock the baseline before construction begins

  3. Step 3

    Code transactions to budget lines as bills come in

  4. Step 4

    Watch variance live and flag anything outside tolerance

  5. Step 5

    Generate draw packages from current numbers

Ready to see the product?

A 30-minute walkthrough with the team building it. Bring your toughest budget or draw scenario.