Total budget
$189,800
After 4 approved COs
Actual to date
$177,100
93% committed
Net variance
+$12,700
3 trades over benchmark
Marketplace locked
$25,896
14 lines via MC-2026-014
By tag All $189,800 Structural $98,700 Finishes $31,200 Untagged $59,900
All rows 42 Marketplace 14 Internal vendor 21 Unassigned 7
Trades
Drag to reorder
F
Framing
$52,000 · $29.15/SF · NHBA 27% typical
Structural
Under
S
Site work
$12,400 · $6.95/SF · NHBA 7% typical
On
Fd
Foundation Override
$28,500 · $15.97/SF · NHBA 14% typical
Structural
Over
R
Roofing
$18,200 · $10.20/SF · NHBA 10% typical
On
Ri
Rough-ins
$38,400 · $21.52/SF · NHBA 21% typical
Over
I
Insulation
$8,800 · $4.93/SF · NHBA 5% typical
Finishes
No txns
E
Exterior
$22,400 · $12.56/SF · NHBA 12% typical
Over
D
Driveway and concrete
$9,100 · $5.10/SF · NHBA 3% typical
+71%
Framing Marketplace MC-2026-014
Summit Framing LLC · Contract FR-2026-03 · via BuilderGrid marketplace
$14,200 under budget
Open to bid
Trade budget
click to edit · Enter to save
Cost / SF
$29.15
1,784 SF total
NHBA share
27% typical
Single-family 2025
Benchmark
$47,800 to $58,400 typical · current is inside range
DescriptionSourceQtyUnitUnit priceWasteExtendedActualVarianceVendorL/MBenchmark
Locked by MC-2026-014 Exterior wall framing Marketplace · Summit 1,784SF$6.200%$11,061$11,061$0 Summit FramingSub $5.80 to $7.00/SF
Locked by MC-2026-014 Interior wall framing Marketplace · Summit 1,784SF$2.800%$4,995$4,995$0 Summit FramingSub $2.50 to $3.20/SF
Locked by MC-2026-014 Roof trusses (engineered) Marketplace · Summit 12EA$8200%$9,840$9,840$0 Summit FramingMat $700 to $950/EA
LVL beams · main span Internal · 84 Lumber 3EA$1,4000%$4,200$4,200$0 84 LumberMat $1,100 to $1,600/EA
Sheathing · OSB 7/16" Internal · 84 Lumber 86SH$2810%$2,649$2,640−$9 84 LumberMat $24 to $27/SH
Misc framing labor and supervision Internal · Summit 1LOT$5,9040%$5,904$5,904$0 SummitLabor $5.5k to $7k
Trade total $38,649 $38,640 −$9
Audit history
View all
$
Budget changed $54,000 → $52,000
James Mitchell · marketplace contract awarded under bid
Apr 12 · 09:14
+
Line item added · LVL beams · main span
James Mitchell · $4,200 added to trade total
Apr 8 · 14:02
CO
CO-002 applied · +$1,800
Sarah Park · approved change order
Mar 28 · 16:40
~
Trade renamed "Framing - rough" → "Framing"
James Mitchell
Mar 20 · 10:12
*
Trade seeded from template
Initial budget $54,000 from Single Family Spec template
Mar 14 · 08:00
Active marketplace contracts
3
MC
MC-2026-014 · Summit Framing LLC
Framing · 5 lines locked · $25,896 of $32,058 drawn
MC
MC-2026-022 · Blue Ridge Plumbing
Rough-ins · 3 lines locked · $12,400 drawn
MC
MC-2026-031 · TK Concrete
Foundation, driveway · 2 lines locked · $24,200 drawn
Recent budget activity
CO
CO-004 approved · +$2,840
Roofing · ridge vent upgrade
Apr 12
MC
MC-2026-022 signed
Blue Ridge Plumbing locked in
Apr 8
!
Driveway over benchmark
Flagged 71% above regional benchmark
Apr 4