Gates Open (clear-to-release)
3
Gates Blocked
1
Athens 2611 Riverbend
Re-inspection Pending
1
Smoky Mountain
Avg Gate Time
1.4d
Inspection → release
926 Stratford · Draw #4Gate open
Pass Rough-electrical · NEC 2023 §210, §314
Inspector R. Vance · 2026-04-29 · 18 line-items pass
Phase: Rough-In · Required inspections: rough-plumbing · rough-electrical · rough-HVAC (not required for this draw)
Approve draw →
2611 Riverbend · Draw #1Gate blocked
Fail Rough-electrical · NEC 2023 §210.8 GFCI
Inspector R. Vance · 2026-04-28 · 4 fails, 14 pass
View inspection report →
14 Highland Pointe · Draw #2Gate open
Pass Framing · IRC 2021 R602
Inspector L. Carter · 2026-04-26 · 22 line-items pass
Phase: Framing · Required inspections: framing
Approve draw →
42 Pine Hollow · Draw #3Re-inspection pending
Scheduled Insulation · IRC 2021 N1102.1
Re-inspection 2026-05-03 · Inspector to be assigned
Phase: Insulation & Drywall · Failed initial inspection · air-sealing gaps in attic plenum.
Gate rules, your institutional defaults
PhaseRequired inspectionsFail actionOverride
Site & FoundationFooting · slab pre-pour · underground plumbingBlockSenior credit officer (logged)
Framing & Rough-InFraming · rough-plumbing · rough-electrical · rough-HVACBlockSenior credit officer
Insulation & DrywallInsulationBlockSenior credit officer
Finishes·Allow with note·
Final & COFinal · CO issuedBlock·
Override is logged to the loan audit trail with reason and approver. Edit phase requirements under Settings → Inspection rules.